NOV Chart for .NET Features

Charting Types

A complete and unrivaled set of charting types with many customization options is implemented to ensure that you have a superior set of data visualization methods "out of the box."

Area

3d multi series area chart
Support for standard area chart, scatter area, stacked area and stacked percent area chart. Support for Fast Area Series.

Bar and Column

2D Bar Chart
Support for standard categorical bar chart, clustered bar/column, stacked bar/column, as well as clustered-stacked bar/column chart with numerous customization options. Support for XY, and XYZ scatter stack and clustered bar charts. Support for Fast Far Series.

Box and Whiskers

box and whiskers chart
Support for box and whisker plots, allowing for the interpretation of data distribution. Each box represents data for minimum, maximum, median, quartiles, outliers, and optional mean values.

Bubble

2d bubble chart
Support for categorical, XY, and XYZ scatter bubble charts, with many customization options for bubble shape, size, and appearance.

Error Bar

xy error bar chart
Y Error Bar, XY Error Bar, XYZ Error Bar, with support for XY and XYZ scatter for the bar position.

Funnel

3d funnel chart
Funnel charts are often used to represent stages in a sales process and show the amount of potential revenue for each stage. This type of chart can be useful also in identifying potential problem areas in an organization’s sales processes. A funnel chart is similar to a stacked percent bar chart.

Heat Map

heat map contour chart
A Heat Map is a 2D representation of data where the individual values are contained in a matrix and are represented as colors, which are taken from an associated palette. Heat Maps support contour generation and smart contour labeling. Support for different variants of the heat map such as triangulated and mesh heat map series.

High-Low

2d high low intersecting chart
High low area with built-in appearance logic. Supports markers. XY scatter mode is also supported (date-time range chart).

Line

smooth line chart
A standard line chart, stacked line chart, step line and smooth line with multiple customization options. Support for XY, and XYZ scatter line. Support for stacked and 100% stacked line charts in 2D and 3D. Support for Fast Line Series.

Pie

pie chart nonoverlapping labels
Pie chart with multiple customization options, including specified begin and sweep angles, different label layout strategies, pie segment shapes, exploded pie segments, etc. Support for multiple pie series also called Doughnut chart.

Stock

stick stock chart
Stock chart with support for stick and candle drawing styles. Open High Low and Close High Low chart subtypes are also supported. Support for XY Scatter mode (date-time stock chart).

Point

2d point chart
Categorical, XY scatter, and XYZ scatter point chart. The point series supports several distinct point shapes, empty data points, different sizes and appearances per data point, and more. Support for Fast Point Series.

Polar

polar chart value axis position
Polar chart with line, point, area, range (wind rose), and vector charting types. Support for docked and crossed polar axes.

Vector

3d vector field chart
Vector charts display vectors in 2D and 3D. Each vector data item is defined by two points (begin - end) and is represented by a single arrow. An arrowhead is placed at the endpoint to indicate the vector's direction.

Ternary

ternary point
Ternary chart displays data consisting of three variables that sum to a total. This allows them to visualize specific data sets consisting of three variables that usually represent mixture compositions that sums to a total.

Tree Map

tree map chart
Tree maps display hierarchical (tree-structured) data as a set of nested rectangles. Tree maps allow you to easily see patterns that would be difficult to spot in other ways, such as if a certain node value changes by a large amount or the relative node value vs. the other node values. The second advantage of tree maps is that, by construction, they make efficient use of space. As a result, they can legibly display a large number of items simultaneously on the screen.

Kagi

kagi chart
Kagi is a type of financial chart illustrating the forces of supply and demand on security. It is focused on price action and disregards the passage of time.

Point and Figure

point and figure chart
Point and Figure is a type of financial chart designed to filter non-significant price changes and focus on the main price trends. Point and Figure charts are usually used for longer-term price movements.

Three Line Break

three line break chart
Three Line Break is a price change financial chart that is similar in concept to Kagi, Renko, and Point and Figure.

Float Bar (also called Gantt)

gantt chart
Float Bar Charts display value ranges using bars that span between a start and an end value. They are ideal for visualizing intervals and durations, such as Gantt charts. Supports DateTime and DateTime Clustered Float Bar variations.

Radar

radar area chart
Contour and filled area styles. Supports markers. A unique - elevated center feature.

Renko

renko chart
Renko is a type of financial chart that is very effective for traders in identifying essential support and resistance levels. It filters minor price movements and emphasizes general trends.

Mesh Surface

mesh surface 3d spiral chart
Surface connecting a grid of points defined by their X, Y, and Z coordinates. The mesh surface can be filled with an automatic or user-defined palette, smooth palette filling is also supported. Several frame styles are available, including Mesh, Contour, Dots, and Mesh-Contour, which can be displayed uniformly or synchronized with the palette. Supports custom contour lines and flat mode (Mesh Contour chart).

Grid Surface

grid surface chart
Surface connecting a grid of data points where each row and column of the grid have equal X and Z values and a distinct Y value (elevation). The rows and columns of the grid can be regularly or irregularly spaced. The Grid surface can be filled with an automatic or user-defined palette. Smooth palette filling is supported as well as per-vertex colors. Several frame styles are supported, including Mesh, Contour, Dots, and Mesh - Contour. The frame can be uniformly displayed or synchronized with the used palette. Flat mode is also supported (Grid Contour chart).

Triangulated Surface

triangulated surface chart
This charting type can display a set of points with X, Y, and Z coordinates as a 3D surface. In contrast to the Mesh Surface chart, the Triangulated Surface doesn't require the points to be ordered in a grid. The control creates a triangular network automatically.

Vertex Surface

vertex surface chart
The Vertex Surface series allows the visualization of data points with user-specified 3d primitives such as triangle, triangle fan, triangle strip, etc. The user can also specify the order in which vertices are connected to form the specified 3d primitive. Also supported is per vertex color, automatically generated contour lines and palette filling.

Chart Axes Features

NOV Chart for .NET provides a complete set of axis-related features designed to target even the most compelling charting requirements. The axes are largely automated, allowing you to focus on your project and be able to customize every aspect of the appearance and behavior of the axis if needed. Following is a short list of the axis-related features of the component:

Axes Position


Docked Axis Positioning

Primary and secondary y axes
Docked Axes let you display multiple axes on the same side of the chart without overlapping, making it easy to compare data series with different units or measurement scales.

Crossed Axis Positioning

Axis value crossing
Crossing Axes let you position two or more axes to intersect at specified values, making it easy to show Cartesian coordinate systems with all four quadrants.

Scale Types


Ordinal Scale

Axis ordinal scale
A type of scale used to display ordinal (categorical) data on the axis.

Numeric Scale

Logarithmic Scale
A type of scale used to display any data in numeric format (profit, sales, percentages, etc.) as well as to use linear, exponential, and logarithmic scaling.

DateTime Scale

Date time scale
General date time scale suitable for the display of date time data.

Time Span Scale

timespan scale
Time Span Scale allows you to display data measured over different time spans, representing durations, intervals, or elapsed time rather than absolute dates/timestamps.

Value Timeline Scale

Value timeline scale
The Value Timeline Scale is a variation of the date/time scale that uses several date-time units for decoration and is commonly used in financial charts.

Range Timeline Scale

Range timeline scale
The Range Timeline scale is an advanced date-time scale is most commonly used in financial and project management charts.

Angular Scale

Polar value axis position
The Angular scale allows you to display angular data in degrees and grads and is used in polar charts.

Hierarchical Scale

Hierarchical scale
The Hierarchical scale allows you to display grouped categorical data.

Table Scale

table scale
The Table Scale allows you to display multiple rows of categorical data. It also supports optional column and row headers.

Scale Properties


Title

Title positioning
The Title functionalities of the component provide control over the chart axis title text, appearance, position, and angle.

Ruler

Axis rules caps
Control over the begin/end ruler caps as well as the option to highlight scale breaks on the ruler.

Gridlines

Axis gridlines 2D
Control over the major and minor gridline's appearance.

Ticks

Axis ticks
Ticks are usually represented as lines and can appear on both sides of the scale ruler. In NOV scales, define two types of ticks – major and minor. The Ticks functionalities of the component provide control over the appearance and position of the minor and major ticks on the chart axis.

Stripes

Axis stripes 2D
Ability to highlight repeating ranges of data on the chart walls, with controllable show/hide pattern.

Sections

Axis sections
Ability to conditionally modify the appearance of axis decorations (tick, gridlines, and labels) if they fall in a specified range. This feature allows you to highlight important ranges of data on the axis.

Const Lines

Axis reference lines
Ability to show constant (reference) lines at specified value. Const lines are lines displayed at axis values and are usually used to display some chart-specific limit or targeted value.

Scale Breaks

Scale breaks appearance
Scale Breaks skip a range of values on the axis to increase the readability of the chart. NOV Chart for .NET provides support for manual and automatic scale breaks with full control over appearance and behavior. X and Y scale breaks can be crossed.

Label Layout

Label layout Stagger Labels
Ability to control how the axis must resolve label overlapping and layout options.

Label Formatting

Axis Labels Orientation
Ability to control the label formatting on numeric scales - including many advanced options for currency, percentage, scientific, and date-time label formatting.

Other Features

non overlapping data labels

Non-Overlapping Data Labels Layout

Data point labels of Cartesian, Polar, and Radar charts can be automatically re-arranged in order to avoid overlaps and ensure maximum visibility for the chart elements.

Interactive legend

Flexible integrated legend

The Legend functionalities of the component include lots of predefined styles, positions, and data layout strategies.

combo chart cluster bar line

Ability to display several charting types simultaneously

Advanced chart margins and fit strategy control.

financial combo chart

Ability to display several chart series simultaneously

Making a chart-type combination chart has never been easier and more flexible.

Chart legend docking

Ability to display multiple charts and legends

Charts can be described in one or more legends. Legends can describe multiple charts.

Chart labels general header footer

Labels

Headers, footers as well as custom positioned labels.

Rectangle zoom tool

Interactivity

The Interactivity functionalities of the component include tools like Data Zoom, Data Pan, Tooltip, Mouse Cursor, and others.

Hit testing

Hit Test capabilities

Support for hit testing the control in order to get the chart element under a specified position.

Serialization

Serialization Support

The control supports serialization/deserialization of its state to a file or stream.

Image export

Image Export

The control supports image export in the following formats: BMP, JPEG, PNG, and PDF.